|
|
zz |

|
|
|
|
PG-ROI
EXAMPLE 4
Benefit
of long term maintenance
Base Case Assumptions |
|
 |
x |
 |
|
|
|
|
|
The
general input data determine the plant
performance with 720 MW, 8000 hrs/yr
and 56.5% efficiency for both options.
|
|
The
difference is in the costs for long
term maintenance, which is
3 mUSD for each maintenance with special
coated blades and only 2.5 mUSD at each
maintenance with normal blades. |
|
|
|
xx |
|
|
|
|
|